Industrial assembly
Orientation points for the assembly
If a machine has to be dismantled, the rule is: the less dismantling is required, the less effort is involved. Our services begin with the planning of the dismantling and end with the commissioning at the new location, whether in the same plant, in a neighbouring town or on another continent.
We can rely on our own specialised staff and a wide range of professional equipment.
- Engineers
- Electricians
- Mechanical engineers
- mechatronics engineers
- 1. What is to consider
When dismantling, it is advisable to create your own cable assignment plans. In the course of a machine's life cycle, there are usually changes that are not documented. In the case of computer-controlled machines, the data is backed up. In addition, so-called buffer batteries are replaced to ensure that the programmes remain stored on the system.
A net and a double bottom should also be used in the mechanical area. Firstly, the components are measured in relation to each other, then labelling is applied to the frame and finally the whole thing is documented with digital images.
- 2. Wissensvorsprung durch frühzeitige Einbindung
Je enger die Bindung zum Maschinenbauer ist, desto besser. Manche Dienstleister sind schon beim Grundaufbau einer Maschine mit vor Ort. Sie kennen die Anlage vom ersten Tag an und haben damit einen Wissensvorsprung, wenn eine Verlagerung ansteht.
Einige der Hilfsmittel lässt HARDER logistics auftragsbezogen fertigen, wie beispielsweise Transportböden, Traversen und spezielle Konsolen, auf denen die Maschinen umgezogen werden.